Search results for "advanced wastewater treatment"

showing 2 items of 2 documents

Intermittent Aeration in a Hybrid Moving Bed Biofilm Reactor for Carbon and Nutrient Biological Removal

2020

The paper presents an experimental study on a lab scale hybrid moving bed biofilm reactor with intermittent aeration. Specifically, a comparison between two different operating conditions was analyzed: continuous and intermittent aeration. Both continuous and intermittent aeration were monitored and compared in order to get the best operational conditions. The intermittent aeration campaign was sub-divided in three phases with different duration of alternation of aerobic and anoxic times and organic and nitrogen loading rates. The efficiency of N-removal improved by 70% during the intermittent aeration. The best condition was observed with 40 min of aeration and 20 min of no-aeration, an or…

0106 biological scienceskinetic testslcsh:Hydraulic engineeringGeography Planning and DevelopmentLab scalechemistry.chemical_elementadvanced wastewater treatment010501 environmental sciencesAquatic Science01 natural sciencesBiochemistryNutrientlcsh:Water supply for domestic and industrial purposeslcsh:TC1-978010608 biotechnologyEffluent0105 earth and related environmental sciencesWater Science and Technologylcsh:TD201-500Settore ICAR/03 - Ingegneria Sanitaria-AmbientaleMoving bed biofilm reactorsndPulp and paper industryAnoxic watersNitrogenintermittent aerationchemistryEnvironmental scienceAerationCarbonWater
researchProduct

Biological nutrient removal using intermittent aeration in a hybrid moving bed biofilm reactor

2012

The paper presents an experimental study on a lab scale pilot plant in a Hybrid Moving Bed Biofilm Reactor. The pilot plant was fed with synthetic wastewater and was in operation considering two different operating conditions: continuous aeration and intermittent aeration. Both continuous and intermittent aeration were monitored and compared in order to seek the best conditions for carbon and nitrogen removal. At the beginning of the experimentation, an initial period of about 90 days was considered during which the pilot plant worked in bench scale configuration for allowing the formation of biofilm on the carriers. Once the biofilm growth was accomplished, the pilot plant worked for a fir…

Intermittent aerationCarbon and nitrogen removalSettore ICAR/03 - Ingegneria Sanitaria-AmbientaleAdvanced wastewater treatment
researchProduct